Job Report
News
COVID-19 UPDATE
At This Time, We are Still Open! Maxon Industries, Inc. will remain open as a key supplier of critical components in accordance with the Presidential Guidance issued March 16th that specifically [...]
Read more COVID-19 UPDATE
Kiewit Utilizes Trio of Surgecretes for Tampa Reservior Repair
Kiewit utlizies trio of Maxon Surgecretes to repair and rebuild C.W. Bill Young Regional Reservoir in Tampa Bay, Florida.
Read more Kiewit Utilizes Trio of Surgecretes for Tampa Reservior Repair
New Orleans Hurricane Storm Surge Barrier
At $14.6 billion dollars, the new New Orleans area Hurricane and Storm Risk Reduction System is the largest Corp of Engineers job ever constructed in the United States. The system is designed to [...]
Read more New Orleans Hurricane Storm Surge Barrier
Lake Mead Tunnel Intake #3
Barge Mounted Maxcretes Supply Concrete 24/7 for 12 days Lake Mead feeds over 90% of the fresh water to the Las Vegas, NV area. During an 11 year drought, water levels dropped significantly, [...]
Read more Lake Mead Tunnel Intake #3
Olmsted Locks and Dam Project
Maxon equipment is used on the Olmstead Locks and Dam project alongside Putzmeister America equipment.
Read more Olmsted Locks and Dam Project
Maxcrete Mixes Foam Concrete on East Side Access Project NY
The East Side Access Project required a unique solution to redirecting the hard rock TBM at a critical intersection linking the Long Island Railroad Commuter Train Line tunnel to the tunnel [...]
Read more Maxcrete Mixes Foam Concrete on East Side Access Project NY
Panama Canal 3rd Set of Locks
General Contractor GUPC (Sacyr Vallehermoso/Impregilo/Jan de Nul/Constructora Urbana J.V.) selected Maxon Agitors and Surgecretes for use in the expansion of the Panama Canal, one of the largest [...]
Read more Panama Canal 3rd Set of Locks
The Dalles Dam Spillway Bay 8 and 9
Maxcretes Speed Delivery of Concrete to Corps Job on Columbia River Project Overview The Dalles Dam is a hydroelectric dam spanning the Columbia River, two-miles (3 km) east of the city The [...]
Read more The Dalles Dam Spillway Bay 8 and 9
Grow-Perini- Skanska J.V. NYC Water Tunnel No. 3
Agitors and Maxcretes Handle Harsh Concrete Mix in NY City Water Tunnel The New York City Water Tunnel No. 3 is the largest capital construction project in New York City’s history. Constructed [...]
Read more Grow-Perini- Skanska J.V. NYC Water Tunnel No. 3
Maxcrete Solidifies Dredged New Bedford Harbor Soils
Waste solidification contractor Dry Dredge Inc. of Boston, MA, utilized a Maxon 10 cubic yard Maxcrete to solidify 60,000 yards of contaminated harbor sludge from the New Bedford Harbor. The [...]
Read more Maxcrete Solidifies Dredged New Bedford Harbor Soils
Load more
Something went wrong, please try again later or contact the site administrator
Categories
- Agimax
- Agitor
- Concrete Paving
- Dams and Civil
- Environmental Solidification
- Event
- Marine and Offshore
- Maxcrete
- MinI Maxcrete
- Mobile Agitor
- Mobile Maxcrete
- Neva-Shock
- Paste Backfill
- Prestress and Precast
- Remote Concrete Delivery
- Surgecrete
- Track-Mounted Equipment
- Transmixer
- TranzLoader
- Travel Mixer
- Tunneling Mining and Shotcrete
- Uncategorized
- Underground
- Underground
Recent posts
-
Maxon Units Available for Rent!August 7, 2024
-
Maxon Agitors and Surgecrete Head to the UP!July 27, 2024
-
Rail Mounted Mobile Maxcrete Used for REM Light RailJune 28, 2024
-
NAT 2024 JUNE 23-26, 2024June 14, 2024