Marine and Offshore
News
New Orleans Hurricane Storm Surge Barrier
At $14.6 billion dollars, the new New Orleans area Hurricane and Storm Risk Reduction System is the largest Corp of Engineers job ever constructed in the United States. The system is designed to [...]
Read more New Orleans Hurricane Storm Surge Barrier
Lake Mead Tunnel Intake #3
Barge Mounted Maxcretes Supply Concrete 24/7 for 12 days Lake Mead feeds over 90% of the fresh water to the Las Vegas, NV area. During an 11 year drought, water levels dropped significantly, [...]
Read more Lake Mead Tunnel Intake #3
Olmsted Locks and Dam Project
Maxon equipment is used on the Olmstead Locks and Dam project alongside Putzmeister America equipment.
Read more Olmsted Locks and Dam Project
The Dalles Dam Spillway Bay 8 and 9
Maxcretes Speed Delivery of Concrete to Corps Job on Columbia River Project Overview The Dalles Dam is a hydroelectric dam spanning the Columbia River, two-miles (3 km) east of the city The [...]
Read more The Dalles Dam Spillway Bay 8 and 9
Load more
Something went wrong, please try again later or contact the site administrator
Recent posts
-
Upcoming EventsFebruary 12, 2019
-
Check out the VSP-70 WOC 2019 booth C5726January 20, 2019
-
Maxon Agitors for Kreite Group’s December 2018December 17, 2018
-
Kiewit Utilizes Trio of Surgecretes for Tampa Reservior RepairDecember 15, 2018
-
Agitors Paving for Michels on I-94 in Kenosha AreaOctober 25, 2018