Maxcrete
News
Maxon Reconditions Equipment
If your Maxon equipment is in need of a little tender loving care, Maxon can recondition your unit! Maxon will also recondition any used equipment.
Read more Maxon Reconditions Equipment
A Maxon Con Forms Engineered Solution
Together Maxon and Con Forms have engineered a complete concrete pumping solution for a Maxon customer with a tunneling project.
Read more A Maxon Con Forms Engineered Solution
Track-Mounted Maxon Maxcrete
Maxon Industries has created a track-mounted Maxon Maxcrete able to transport concrete up mountains. Aint no mountain high enough!
Read more Track-Mounted Maxon Maxcrete
Rail-Mounted Electric Equipment for Atlanta Water Supply Tunnel
Maxon built an electric rail-mounted Maxcrete and BSA120 to meet the Water Supply Tunnel project needs in Atlanta, Georgia.
Read more Rail-Mounted Electric Equipment for Atlanta Water Supply Tunnel
RETC 2019 BOOTH #905
Maxon Industries will be joining the Putzmeister America Exhibit (Booth 905) at the Rapid Excavation and Tunneling Conference (RETC) June 16-19,2019 in Chicago, Illinois Stop by the booth [...]
Read more RETC 2019 BOOTH #905
New Orleans Hurricane Storm Surge Barrier
At $14.6 billion dollars, the new New Orleans area Hurricane and Storm Risk Reduction System is the largest Corp of Engineers job ever constructed in the United States. The system is designed to [...]
Read more New Orleans Hurricane Storm Surge Barrier
Lake Mead Tunnel Intake #3
Barge Mounted Maxcretes Supply Concrete 24/7 for 12 days Lake Mead feeds over 90% of the fresh water to the Las Vegas, NV area. During an 11 year drought, water levels dropped significantly, [...]
Read more Lake Mead Tunnel Intake #3
Olmsted Locks and Dam Project
Maxon equipment is used on the Olmstead Locks and Dam project alongside Putzmeister America equipment.
Read more Olmsted Locks and Dam Project
Maxcrete Mixes Foam Concrete on East Side Access Project NY
The East Side Access Project required a unique solution to redirecting the hard rock TBM at a critical intersection linking the Long Island Railroad Commuter Train Line tunnel to the tunnel [...]
Read more Maxcrete Mixes Foam Concrete on East Side Access Project NY
The Dalles Dam Spillway Bay 8 and 9
Maxcretes Speed Delivery of Concrete to Corps Job on Columbia River Project Overview The Dalles Dam is a hydroelectric dam spanning the Columbia River, two-miles (3 km) east of the city The [...]
Read more The Dalles Dam Spillway Bay 8 and 9
Load more
Something went wrong, please try again later or contact the site administrator
Categories
- Agimax
- Agitor
- Concrete Paving
- Dams and Civil
- Environmental Solidification
- Event
- Marine and Offshore
- Maxcrete
- MinI Maxcrete
- Mobile Agitor
- Mobile Maxcrete
- Neva-Shock
- Paste Backfill
- Prestress and Precast
- Remote Concrete Delivery
- Surgecrete
- Track-Mounted Equipment
- Transmixer
- TranzLoader
- Travel Mixer
- Tunneling Mining and Shotcrete
- Uncategorized
- Underground
- Underground
Recent posts
-
Maxcrete Remixes Concrete for Chicago Harbor Lock & DamFebruary 29, 2024
-
Factory Refurbished Truck Mounted 12 yd Agitors For SaleFebruary 7, 2024
-
RETC 2023 BOOTH 529 June 11-14thMay 25, 2023
-
Used Truck-Mounted Maxon Agitor For Sale! *SOLD*March 23, 2023