Maxon Equipment Used For Cannelton Hydroelectric Power Plant
Maxon Agitors, Surgecretes and Conveyors Used for Cannelton Hydroelectric Power Plant
Walsh Construction Group
CONTRACTOR
LOCATION
Kentucky, USA
APPLICATION
EQUIPMENT
SHARE:
THE CHALLENGE
Walsh Construction Group completed construction of the Cannelton Hydroelectric Power Plant adjacent to the existing Cannelton Lock and Dam on the Ohio River. Walsh assembled a central mix concrete batch plant onsite and utilized an overland conveyor to transport and place nearly 100,000 cubic yards of concrete for the intake approach channel, powerhouse, and tailrace. Maxon, in conjunction with Putzmeister America and Continental Conveyors (Marco), supplied the entire concrete transportation and placing system.
Equipment included:
- Maxon Surgecrete
- Maxon Agitors
- Marco Overland Conveyor
- Putzmeister MXTB 130 Tower-Mounted Placing Conveyor
- Putzmeister TB 130 Truck-Mounted Placing Conveyor