QUESTIONS? CALL US: 1 (800) 236-9944

Intel Chip Plant utilizes Maxcrete for Concrete Placing

 
Mobile Conveying Services Telebelt Placing Concrete for Intel Chip Plant

Maxon Maxcrete remixes and conveys concrete to Mobile Conveying Services Telebelt placing concrete at Intel Chip Plant.

 
LOCATION

New Albany, Ohio, USA

 
APPLICATION

Dams and Civil

 
EQUIPMENT
 
SHARE:

The Project

 

Bechtel Corporation was awarded Phase 1 of the Intel Corp chip plant project, a 2.5 million square foot construction design in New Albany, Ohio. Mobile Conveying Services (Brisbane, Australia) supplied a Putzmiester TB200 Telebelt, and a Maxon 18yd3 Maxcrete, a concrete remix surge hopper.

The Maxcrete was positioned to allow up to four mixer trucks to unload quickly and return to the batching plant.  The Maxcrete maintained the concrete quality by mixing multiple loads together and providing a continuous volume of concrete on to the feeder belt.  The Maxcrete was able to meter the material for even loading of the belt for maximum production. The TB200 was used to place concrete for the footings, foundations and floor panels. With this combination of equipment, Bechtel was able to place concrete at rates up to 400 yds3 per hour with a reach of 200 feet.

 

 
Truck Mixers Feeding Maxcrete
 
Maxcrete hopper remixes concrete for Telebelt
 
Maxcrete conveys concrete to the TB200 Telebelt.

Maxcrete accepts concrete from ready mix trucks.

Maxcrete remixes concrete.

Maxcrete feeds TB200 Telebelt to place concrete.

 
WOULD YOU LIKE TO KNOW MORE? Call Us At 800-236-9944 or CONTACT US
X