Maxon Agitors, Surgecretes and Conveyors Used for Cannelton Hydroelectric Power Plant

Walsh Construction Group

 
Maxon Agitor feeds to Putzmeister Telebelt
 
LOCATION

Kentucky, USA

 
APPLICATION
 
 
SHARE:

THE CHALLENGE

 

Walsh Construction Group completed construction of the Cannelton Hydroelectric Power Plant adjacent to the existing Cannelton Lock and Dam on the Ohio River. Walsh assembled a central mix concrete batch plant onsite and utilized an overland conveyor to transport and place nearly 100,000 cubic yards of concrete for the intake approach channel, powerhouse, and tailrace. Maxon, in conjunction with Putzmeister America and Continental Conveyors (Marco), supplied the entire concrete transportation and placing system. 

Equipment included:

  • Central mix batch plant with twin shaft mixer was erected approximately 1,200' from the powerhouse concrete placement.
WOULD YOU LIKE TO KNOW MORE? Call Us At 800-236-9944 or CONTACT US